COUNTRY:
Italy
Fruit processing line-2
30 May 2024FILLER WITH 88 ELECTRONIC TAPS FOR CHAMPAGNE
30 May 2024REFERENCE STANDARDS:
EN 60439-1; EN 60204-1; UNI EN ISO 13849-1/2; EN 61131-1-2-3
PROJECT:
Automation with Redundant CPU in LevelR2 – Redundant NAP, 2 AR for an industrial wastewater treatment plant
SUPPLY DESCRIPTION:
Design and implementation of hardware/software/machine board, commissioning, operator training
TECHNOLOGIES USED:
Tia Portal V17, CPU 1500-H, Remote I/O R2, Fuji inverter
DISTINCTIVE ELEMENTS:
High redundancy and oversizing of components to ensure continuity of operation, continuous monitoring of electronic and electromechanical components to anticipate and diagnose malfunctions
CLIENT BENEFITS
Reliability of a plant that ensures compliance with legislative thresholds for wastewater treatment